Woodwarm fireview 5

 Fireplace rebuild in Dunster

This fireplace rebuild was carried out in Dunster somerset and was particularly difficult. The chamber walls needed to be built up over a couple of days to create a square recess. A concrete lintel needed to be inserted. We also laid a 25mm Brazilian slate hearth. Chimney was lined with 316 stainless steel flexible liner, the Woodwarm Fireview 5 is a personal favourite of ours as it s locally made and very easy to control.

 

 

open fire lintle woodwarm fireview 5